Factory directly sale TU-1F05 thermal wax actuator for air conditioner and compressor to panama Manufacturer
Short Description:
Product Detail
Product Tags
Factory directly sale TU-1F05 thermal wax actuator for air conditioner and compressor to panama Manufacturer Detail:
1. Operation Principle
The Thermostatic Wax that has been sealed in shell body induces expansion by a given temperature, and inner rubber seal part drives its handspike to move under expansion pressure to realize a transition from thermal energy into mechanical energy. The Thermostatic Wax brings an upward movement to its handspike, and automatic control of various function are realized by use of upward movement of handspike. The return of handspike is accomplished by negative load in a given returned temperature.
2. Characteristic
(1)Small body size, occupied limited space, and its size and structure may be designed in according to the location where needs to work.
(2)Temperature control is reliable and nicety
(3)No shaking and tranquilization in working condition.
(4)The element doesn’t need special maintenance.
(5)Working life is long.
3.Main Technical Parameters
(1)Handspike’s height may be confirmed by drawing and technical parameters
(2)Handspike movement is relatives to the temperature range of the element, and the effective distance range is from 1.5mm to 20 mm.
(3)Temperature control range of thermal wax actuator is between –20 ~ 230℃.
(4)Lag phenomenon is generally 1 ~ 2℃. Friction of each component part and lag of the component part temperature cause a lag phenomenon. Because there is a difference between up and down curve of traveling distance.
(5)Loading force of thermal wax actuator is difference, it depends on its’ shell size.
Product detail pictures:
Always customer-oriented, and it's our ultimate target to be not only the most reliable, trustable and honest supplier, but also the partner for our customers for Factory directly sale TU-1F05 thermal wax actuator for air conditioner and compressor to panama Manufacturer, The product will supply to all over the world, such as: kazakhstan , Hyderabad , Iceland , We warmly welcome domestic and overseas customers to visit our company and have business talk. Our company always insists on the principle of "good quality, reasonable price, the first-class service". We are willing to build long-term, friendly and mutually beneficial cooperation with you.
www.jingcheng-noodlemachine.com
Chow mein noodle machine production line is researched and developed by the company independently so as to meet the market demands, adsorbing advantages of similar equipment at home and abroad, the product is a leading Non instant noodle production equipment at home, which is elaborately designed and manufactured by experts with rich wisdom and experience, and it is perfect carrier of mechanical-electrical integration in the whole production line, the product owns advantages as follows:
1.1.1Advanced technologies and high automation
⑴The closed-loop speed control system, consisting of speed feedback control and high-precision pulse coder, is designed to perform synchronous control on the whole production line, and it is featured of easy adjustment and high precision synchronization.
⑵It takes the programmable logic controller (PLC) as the process center, and perform automatic control on the process, and the motors on most single machines adopt frequency speed control.
1.1.2High quality, efficiency and sound shaping
⑴The dough has regular shape, uniform corrugation, well-proportioned color and high quality.
⑵It has stable performances and high efficiency and easy to operate.
⑶The whole production line is well designed with sound shaping, applicability and safety.
1.1.3Advanced process
⑴The dough mixing machine is designed with double shafts and double speeds for optimal dough mixing effect.
⑵ The calendar ratio of noodle maker is designed logically, and the clearance between rollers is easy to change.
⑶Single layer or multi-layer steaming machine is designed with originative structure, where the temperature remains proper and the pasting degree of noodles keeps higher.
After being cut off, the dough keeps high proportion to be placed in a box, meanwhile, it is unnecessary to stop the machine to finely adjust the weight of the dough.
⑸High heat exchange rate in drying, no pollution .
1.1.4New and hi-tech facilities, and precision finishing
⑴High-precision sensors and control elements, sound quality, stable and reliable.
⑵The rollers adopt centrifugal casting with cold and hard alloy, processed with accuracy, and the hardness on the surface of the products reach over HRC45, featured of abrasion resistance and long service life.
1.1.5To take full consideration for food sanitation and production environment.
⑴Spare parts that touch flour, noodles and dough are made of stainless steel or materials harmless to the body.
⑵Steamer and drier are equipped with heat insulation material so as to prevent
heat dissipation.
⑶The steamer, drier and cooling machine discharge muggy air out of the chamber, which could improve the operational environment in workshops but also reduce environment pollution indoors.
The equipment is used for the continuous production of dried instant noodle with high yield, the final products can be edible with hot water . The instant noodles with water taste soft and sound in chewing;
https://www.etrailer.com/tv-demo_trailer_brakes_and_wiring.aspx
Videos are provided as a guide only. Refer to manufacturer
installation instructions and specs for complete information.
Today we are going to show you how to install brakes on a trailer that does not have existing brakes. It is actually pretty easy to do it is just very time consuming. There are a few things you want to look out for before you start. One of those things is look being the existing hub you have. Make sure you have a flange like this on the axle. It is this 4 bolt flange on here if you have that on your axle your pretty much home free. You will see it on 3,500 pound axles like we have here. You also see it on 2,000 pound axles. On a 3,500 pound one you would probably use a 10 inch drum and on a lighter 2000 pounds, you would use a 7 inch size. Also you notice we have the hub missing. We have to take that off because the hub and drum assembly it is all in one piece. You have to take off the old hub get rid of it and start off fresh. For this install we are going to install the backing plate. Basically it slides on like so then you just bolt it onto 4 places. A couple things you might want to take note of is there is a left and right side to it also an up and down. The magnet always stays pointed to the ground. If you did not have a sticker like this one does another way to tell is look for this bow here. The actuating arm or bow always points to the front of the trailer so thats a good reference point for you. At this point lets start bolting on our hubs. Works down in a criss cross pattern makes sure you have them evenly tightened. Go ahead and do the same thing for the other side. One thing to note while you are adding the hubs to a trailer. This is double protection that keeps grease in and has a little bit extra pressure. You can also tell it is a double lip seal because it has a spring. Every double lip seal out there has a spring in it. So you have an EZ Lube Spindle or double check. Some spindles like this one come with a tang washer. If yours is just the normal spindle then you just have a counter pin that goes through. In this case we have the EZ Lube spindle so we will go ahead and assemble it. It is only one extra step involved. Make sure you take out any play. A little bit is fine just a hair is all you need. Then flip this edge into place like so. Get it to stop then bring it back one notch. If you had a regular spindle we would be finished by now but since we have the EZ Lube spindle we will go ahead and use that feature fully pack the bearings and bring out the grease to both bearings. Installing our hub is complete now. The next step is to adjust the brakes. From here what we need to do is go ahead and adjust our brakes. Basically what we are going to do is tighten up the drum until it stops turning. Then back off 10 clicks then you should have a very fine light drag. What we need to do now is go ahead and start running the wires. We are going to follow the factory harness back onto the driver side wheel. Then we are going to follow the axle on over to the passenger side wheel. Once you are by the axle here go ahead and leave a little loop for working room. Then make sure it is tied to your passenger side wheel. We will go ahead and at this point zip tie the wire to the axle. At this point you have your wire set across the axle the way you want it so we will go ahead and pull the slack up to the front of the trailer. We will go ahead and make our connection to the wires here. Make sure you note that one wire goes to ground and the other wire goes to positive. Again it does not matter the magnet does not care. We will move over to our driver side now and what we are going to do is install our ground on the inside of the frame here. We are going to put our 7 pole connector on next. It is time to connect to 7 pole connector. What you want to do is match up the colors obviously but there are a few different codes. For instance sometimes red is left turn but on the trailer it is actually yellow. The only common ones is white is ground wire and blue will be used as our black wire. Which the black wire is actually used on here as the 12 volt power lead. We will start off with the ones that match up and that would be the white. Then we will do the brake wire and on the trailer it is black but on the 7 pole it will be blue. Left turn on our trailer is yellow but the left turn on our 7 pole is red. We have green here which is running light and on the trailer it is brown. Finally green is right turn on our trailer and that is brown on our 7 pole. Next we put our connector back in with the little screw. We fix our loom and tighten the last screw.